Other Information
1. Area: Workshop area: 150-200m2, all factory area 2000m2, the bigger, the better.
2. Workers : three or four
3. Ratio of raw material:cement 8%-10%;sand 30%-40%;stone:50%-60%,about cement :sand : stone is 1:4:5.
4.hollow block weight:(400*200*200) :17KG,(400*150*200):13.5KG,(400*100*200):10KG
5. raw material consumption per day:150-170T
6. water consumption per day:3%-5% of raw material .Weight.
Copyright © Tancheng County Hongbaoyuan Machinery Co., Ltd. - Privacy policy